Numerous cracks on the pavement of the bridge led to the fact that the provincial authorities decided to close it partially.
The westbound curb lane of the Red River Bridge, along the South Perimeter Highway, is closed for an undefined period. More detailed information about the opening of the road will appear after a special inspection.
Only after this inspection, the authorities will be able to report a more specific repair time. To keep up with all the traffic news, you can follow Twitter, contact 511 or visit the website.
MORE NEWS: Canadian Cancer Society is not going to accept hair donations in 2019